Foshan NF Modern Custom Made Aluminum Sliding windows

Product Description

★ Products Description
Products Description
Products Description Overview
☰ Specification
Item Exterior and Interior Sliding Window
Brand Foshan NF
Material T6063-5 thermal break aluminiuim profile
Thickness 1.6mm thickness thermal break aluminium profile
Glass A. Single Glass
B. Double tempered glass 5mm+12A+5mm
C. Triple tempered glass 5mm+12A+5mm+12A+5mm
D. Laminated/Lowe/Reflective /Tinted Glass
Surface treatment Powder Coating, Anodized
Wooden Grain, PVDF Coating
Color Customized design color
Application Residential, Villas
Shreshold Low: 38mm
Higher: 80mm
Sliding Way 2 Track Sliding or 3 Track Sliding
Optional Built-In Blinds, Flyscreen, Roller Shutter
Delivery Time 35 days
Certification AS2047, CE
👁 Product details
Product details 1
Product details 2
Product details 3
Product details 4
Product details 5
📄 Certifications
Certifications
👥 Customer Photos and Company Culture
Customer Photos and Company Culture
📦 Product Packaging and Delivery
Product Packaging and Delivery
❓ FAQ
FAQ Overview
What materials are used for the sliding windows?

The windows are manufactured using 1.6mm thickness T6063-5 thermal break aluminium profiles, paired with various high-performance glass configurations.

What glass options are available?

We offer single glass, double tempered glass (5mm+12A+5mm), triple tempered glass (5mm+12A+5mm+12A+5mm), as well as laminated, Low-E, reflective, and tinted glass.

Can colors and surface finishes be customized?

Yes, surface treatment options include powder coating, anodized finishes, wood grain transfer, and PVDF coating in customized design colors.

What optional accessories can be added?

Optional additions include integrated built-in blinds, flyscreens, and roller shutters based on structural and personal requirements.

What certifications do your window products hold?

Our products are tested and compliant with international standards, holding certifications including AS2047 and CE.

What is the standard delivery lead time?

The standard lead time for manufacturing and preparation is approximately 35 days.

Related Products